Vent wastage 02 level STBD side near stack created by guano accumulation
Waterway and drain damaged by guano 02 Level STBD side near hanger Temporary repair with roofing tar
Port side pilot house "16 year old paint in excellent condition"
Port side. Heavy rust follows waterways that were filled with guano.
Port quarter top side Left panel heavy armor plate Right panel light steel
Port AFT corner of mess deck. Observe seagull damage where port was left open.
Typical tank sounding tube
Fantail looking forward at towing windlass port
Fantail Evidence of guano destruction of power cable stuffing tubes. Bird populations perched in Lee by this area. Guano was over 1 foot deep!
Engine room 1A Mostly intact; some gear missing
#1 Engine room access Ships service generators were removed via this access. New engines will come back in via the same route!
#1 Engine room All equipment removed to allow access to ship service generators standing by for reinstallation
#1 Engine room Duct work awaiting reinstall
Click here for photos of Operation Organ Transplant
Click here for archived photos of the crew in action
Glacier Society 905 Honeyspot Road Stratford, CT 06615 (866) ICE PLAY (423-7529) TOLL FREE (203) 375-6638 info@glaciersociety.org
©2000-2003 The Glacier Society